My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-28_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-04-28_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 12:41:51 PM
Creation date
4/29/2011 10:18:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
4/28/2011
Doc Name
Notices ( amendment to CN-01)
From
DRMS
To
Various
Type & Sequence
CN10
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />P21NCORPORATED <br />ENVMOMAMAL AND MGWMNC SERVIM <br />4TRATEC ICALLY POSTOGD-TFGiWALLY PREPARED <br />GEORGE ML ROMBORP.G. <br />I. MCH RAUBMPE <br />MAY DAY AND IDAHO MINE COAMS;i <br />LDCAT G CORPORATION <br />ORIGINAL 112(M PERMIT <br />EXSYBIT A <br />Legd Description <br />Rule 6.4.1 <br />6.4.1(1) Affected Lands <br />The May Day Idaho Mine Complex permit boundary is comprised of 274.7 acres of which 47.6 <br />acres are affected directly or indirectly by future mining and exploration activities. The <br />township and range of the permit boundary is Section 28, T36N, Rl I W, N.M.P.M. <br />The main entrance to the May Day Idaho Mine Complex Universal Transverse Mercator (UTM) <br />Grid as determined by the United State Geological Survey (USGS) is 575797 413661. <br />11 <br />The May Day Idaho Mine Complex includes the following affected lands: <br />May Day No. 1, May Day No.2, May Day No. 3 (Lamb), Idaho Millsite, Payday Millsite, the <br />Chief Tunnel including the access road and drainage channel), La Plata bridge, <br />exploration roads, existing (access) including easement roads, and designated buffer zones <br />ww hin the identified hermit boundary (EzWbit C-4). Areas include constractio_n <br />stariu a areas, the base of operations, areas to accommodate debris basins, rod switch <br />backs. and culverts. <br />Wildcat Mining Corporation has acquired the following legal descriptions for these affected <br />areas: <br />The May Day parcels owned by Fairview Land Company and leased to Wildcat Mining <br />Corporation (Exhibit N, Attachment N-2) include the following parcel legal descriptions: <br />May Day No. 1: a tract of land located in Section 28,136N, Rl I W, N14P.M. and being <br />more particularly described as follows: beginning at a point from which the WIM comer <br />of said Section 28 bears S 70°58'59"W a distance of 3268.40 feet, Thence, N 33°15'W a <br />distance of 300.0 feet, Thence N 56°45 E a distance of 500.0 feet, Thence S 33*1 YE a <br />• <br />May Day Idaho Mine Complex 112(d) Permit Application <br />Revised: April 14, 2011 <br />'Srrategied ly Pwidoned- Technically Prepared„ <br />5555 DTC Parkway Suite A-4000, Greenwood Village, Colorado 80111 <br />Phone: (303)832-7664 1 Fax: (303)832-7469
The URL can be used to link to this page
Your browser does not support the video tag.