Laserfiche WebLink
mining operation at this location. <br /> Use of best management practices <br /> indicates minimization of <br /> disturbance to the hydrologic <br /> balance. <br /> Surface water- Mine pumping <br /> into Fish Creek at site 115 had <br /> ceased in mid-2006, and was <br /> reactivated in 2008. In 2010, Site <br /> 115 did not discharge. Discharge <br /> at 10RT was initiated in early <br /> September 2008 due to a rise in <br /> water levels within sealed mine <br /> areas. During discharge, <br /> downstream water samples were <br /> collected to verify potential <br /> impacts. Samples were collected <br />23. Prevention of at Trout Creek (Site 1005) <br />material damage to the CDRMS regulation downstream of confluences from <br />hydrologic balance 4.05.1(1) YES Fish Creek and Foidel Creek. <br />outside the permit area Subsequent water quality data <br /> from 10RT raw effluent indicated <br /> exceedances for FeTR and WET <br /> tests. TCC discontinued discharge <br /> at 10RT in early 2009 and pumped <br /> directly to the area No. 1 Pit <br /> impoundment. To date no <br /> exceedances have been observed <br /> at the No.1 Pit discharge, Outfall <br /> 005A. <br /> Ground water- No material <br /> damage has occurred, as discussed <br /> in item 21, above. <br />24. Agreement of <br />CDRMS regulation <br />observed hydrologic <br />" 2.05.6(3) and <br />impacts with <br />probable requirement to keep <br />hydrologic <br />" <br />current, CDRMS YES <br />consequences regulation 2.03.3(1) <br />projected in mining <br />25. Adequacy of <br />CDRMS regulation <br />ground water 4.05.13(1) YES <br />monitoring program <br />26. Adequacy of CDRMS regulation <br />surface water 4.05.13(2) YES <br />monitoring program