Laserfiche WebLink
3 m< <br />+ MAILING ADDRESS: P.O. BOX 440 RAPID CITY, SD 57709-0440 PH. 605-342-7224 <br />PHYSICAL ADDRESS: 3401 UNIVERSAL DR. RAPID CITY, SD 57702 Fx. 605-342-6979 <br />T/ <br />PETE LIEN SONS 'BIRDCALL SAND & GRAVEL 'COLORADO LIEN CO. <br />'DAKOTA BLOCK CO. 'TRANS COLORADO CONCRETE <br />PETER C. LIEN BRUCE H. LIEN CHARLES H. LIEN PETER S C. LIEN <br />1898-1969 FOUNDER FOUNDER FOUNDER <br />CHAIRMAN <br />& Sons, Inc. <br />April 25, 2011 <br />RECEIVE[ <br />APR 4 7 1 <br />Division of Reclamation, <br />Mining & Safety <br />State of Colorado <br />r Division of Reclamation, Mining and Safety <br />_ 1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re:/Mining Operations with Exposed Ground water <br />--Or g Dear Mr. W dron: <br />- Thank you for taking the time to discuss the points covered in you April 30, 2010 letter this <br />morning. We believe that the St. Barbara Pit (M-2004-013) owned by Pete Lien & Sons, Inc. is <br />7% <br />f currently operating in compliance under approach number one as listed in your letter. <br />Mining has started on this site and disturbance is in an area that is identified in the reclamation <br />Y?.? plan as "backfilled to approximate original grade". Backfill material to complete this work is <br />available on site and a bond is currently held by the state for approximately $410,000 to <br />complete this work. <br />?t~ The final reclamation for future mining at this site does include lakes and our environmental <br />consultant is reviewing the final design for those to make sure we remain in compliance once <br />mining reaches those areas. If you have any questions please feel free to contact me at (605) <br />,, . 939-2686. <br />,e rte. <br />Thank you, <br /> <br /> <br />Danielle Wiebers <br />Environmental Coordinator <br />Pete Lien & Sons, Inc. <br /> <br />7*kJ