Laserfiche WebLink
001-0 <br />McClane Canyon Mining <br />Water Sampling Re o <br />Date: March 31, 2 <br />Weather Conditions: Clear, 50 - 60 degrees F. <br /> Surface Water <br />Sample <br />Point Time Flow <br />cfs pH EC <br />umhos/cm Temp C <br />SW -1 11:20 AM 5.400 8.2 2200 8.4 <br /> <br />SW-2 <br />11:55 AM <br />Dry <br />- <br />- - <br />- <br />SW -3 10:55 AM Damp - - - <br />SW -5 12:00 PM Dry - - - <br />SW-6 10:55 AM Dry - - - <br />SW -7 10:55 AM Dry - - - <br />SW-8 10:35 AM 5.4 8.3 2500 7.7 <br /> <br /> Ground Water <br />Samp <br />Pointe <br />Time <br />eet <br />pH <br />umhos/cm <br />Temp (C) <br />GW 1 11:10 AM 10.4 7.7 4900 9.4 <br />GW 3 10:50 AM 41.3 7.6 4400 13.9 <br />GW 6 10:55 AM Dry-18.8' <br />GW 9 11:50 AM 26.0 7.5 7000 14.2 <br />Location of Points/Wells <br />SW -1 East Salt Creek above McClane under haul road bridge <br />SW -2 McClane Creek at culvert below mine <br />SW -3 Munger Creek at haul road culvert below mine <br />SW -4 East Salt Creek -2 miles downstream of SW -8 <br />SW -5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW -7 Munger Creek above Mine <br />SW -8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW -x McClane Creek at confluence with East Salt Creek <br />First Quarter 2011 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW-1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW 3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW 6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW 9 Alluvium of East Salt Creek below proposed waste rock disposal area - TD 53.5 <br />GW-1 <br />GW 3 <br />G W-6 <br /> Feet <br />Total Depth 14.3 <br />Total Depth 47.3 <br />Total Depth 18.8 Depth revised when pipe was damaged <br /> during gob pile construction. <br />Total Depth 53.5 <br />y yt' <br />?,'? q <br />b <br />GW 9 <br />