Laserfiche WebLink
i <br />COST SUMMARY WORK <br />Task description: MR -2 Summary <br />Site: Peabody Sage Creek Mine Permit Action: MR2 Permit/Job #: C2009087 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 4/26/2011 County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />Remove Temporary AN Tank <br />DEMOLISH <br />1 <br />0.00 <br />$268.42 <br />SUBTOTALS: <br />0 <br />$ $268.42 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Total = <br />$5.42 <br />Performance bond: 1.05 <br />Total = <br />$2.82 <br />Job superintendent: 2.00 <br />Total = <br />$117.12 <br />Profit: 10.00 <br />Total = <br />$26.84 <br />TOTAL O & P = <br />$152.20 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$420.62 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />0.00 <br />Total = <br />$0.00 <br />Reclamation management and/or administration: <br />5.00 <br />$21.03 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00. <br />TOTAL INDIRECT COST = <br />$173.23 <br />Abbreviation: None <br />Filename: C087 -000 <br />TOTAL BOND AMOUNT (direct + indirect) = $441.65 <br />