My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-03-25_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019A
>
2011-03-25_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:03 PM
Creation date
4/27/2011 1:43:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/25/2011
Section_Exhibit Name
4.05 Hydrologic Balance
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />4.05.3 Diversions and Conveyance of Overland Flow and Shallow Groundwater Flow and <br />Ephemeral Streams Draining a Watershed Less than One Square Mile <br />The drainage and sediment control plan described under Section 2.05.6 provides for temporary diversion <br />of surface drainages within the permit area. A system of temporary ditches, as shown on the Hydrology - <br />South Map (Map 12) and the Hydrology - North Map (Map 11), will divert runoff away from disturbed <br />areas, and in other cases temporary ditches will be used to divert runoff from disturbed areas to sediment <br />ponds. Specifications for all temporary diversions within the permit area are presented within Exhibit 7, <br />Hydrology Information. Temporary diversions will -be constructed to pass at a minimum the runoff from <br />the precipitation event with a two year recurrence interval. <br />The temporary diversions described above will have the purpose of reducing contribution of suspended <br />solids to runoff and diverting undisturbed drainage from the mining area. The diversions will be <br />constructed with a minimum gradient to pass the design flow and will be revegetated with grasses. If not <br />removed by mining, upon completion of mining and at an appropriate point mandated in the Coal <br />Regulations of the Colorado Mined Land Reclamation Board, the temporary diversions will be reclaimed <br />as required in Section 4.05.17. <br />4.05.4 Stream Channel Diversions (Relocation of Streams) <br />A permanent diversion constructed at the operation is used to divert surface runoff from the watershed <br />upslope of the Streeter Fill as detailed in Section 2.06.2. The diversion structure was designed to pass <br />safely the 100 -year, 24 -hour precipitation runoff event. This diversion, located on the north side of <br />Streeter Fill, is riprapped, as required, to control erosion. Design criteria for the permanent diversion <br />structure along with engineering parameters for Streeter Fill are set forth in Exhibit 12, Experimental <br />Practice Information. The permanent diversion structures will remain, but will not provide additional <br />contributions of sediment load to Good Spring Creek as they are designed to safely pass the 100 -year, 24- <br />hour precipitation runoff and are stabilized with riprap. A temporary diversion of Taylor Creek was <br />approved as a Technical Revision on November 19, 1984. The diversion is shown on the Existing <br />Structures -North Map (Map 21), explained in detail in Exhibit 17, Haul Road and Facilities Modifications <br />associated with Colowyo's Raw Water Supply Plan. <br />All temporary diversions will be removed and reclaimed when no longer needed for sediment control in <br />accordance with the Operations and Reclamation Plan described in 2.05.4. Channel lining rock riprap <br />and energy dissipaters will be used when necessary. As stated above, all temporary diversion structures <br />will be seeded and revegetated. Colowyo does not anticipate that there will be any significant excess <br />material resulting from the construction of diversion ditches. <br />None of the proposed diversions will drain into underground mines. <br />No additional diversions of intermittent or perennial streams are planned or provided for at this time. See <br />Mine Plan Map (Map 23), Hydrology South Map (Map 12) and Hydrology - North Map (Map 11). As <br />indicated on these maps, the stream channels of Goodspring Creek will be maintained in its natural <br />positions. <br />Upon completion of each permanent channel segment, an engineering construction report will be prepared <br />and submitted in the Annual Reclamation Report. This report will provide certification by a professional <br />engineer that the channel segment has been constructed to the appropriate widths, lengths, alignment, <br />channel slope and riprap or other erosion protection specifications to meet the intended design criteria. <br />Rule 4 Performance Standards 4.05 -3 Revision Date: 2/01/11 <br />Revision No.: TR -87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.