My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-21_REVISION - M2007087
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007087
>
2011-04-21_REVISION - M2007087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:16 PM
Creation date
4/27/2011 9:28:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007087
IBM Index Class Name
REVISION
Doc Date
4/21/2011
Doc Name
Surety Reduction Approval
From
DRMS
To
Albert Frei & Sons
Type & Sequence
SR1
Email Name
AJW
DB2
AHH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:::.:.......................::::............:::::::::::::::::::::::::.;;:.;;:.;:.;:.;:.;;:.......... <br />HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : I Scraper Bowl (volume) Basis : <br />Material weight : 1,600 pounds/LCY <br />Material description <br />Top Soil <br />Rated payload : 75,000 pounds <br />Payload capacity : 46.88 LCY <br />Cycle Time : <br />Scraper loading time * : 2.40 <br />Maneuver and spread time : 0.70 <br />* load time per scraper pair on push-pull models <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 29.00 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br /> Job Condition Corrections : Site altitude (ft.) : 5,100 <br /> Scraper Push dozer Source <br />minutes Altitude adj.: 1.000 NA (Cat HB) <br />minutes Job efficiency : 0.830 NA (Cat HB) <br /> Net correction : 0.830 NA <br />Travel time : <br />Road condition description :Hard, smooth, stabilized, surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 300 0.00 2.00 2.00 2806 0.40 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 0.40 minutes <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.29 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.80 minutes <br />Unadjusted unit production/hour : 458.26 LCY/hour *** Adjusted for job conditions : 380.36 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 760.72 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 760.72 LCY/hour <br /> <br />JOB TIME AND :C ::::.. ...................._ ...................... _........................._........ __ .._.._.... _............-...._..___........ <br />OST ........._._ <br />Fleet size : 1 Team(s) Total job time : 13.15 Hours <br />Unit cost : $0.982 /LCY Total job cost : $9,816 <br />
The URL can be used to link to this page
Your browser does not support the video tag.