Laserfiche WebLink
:.::.::: ...................:::::::::::::::.:.:.:...:..:.. :....:..:::.::..:::.:::...:.. <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Generic 10-12 cy, 6x4 $88.82 5 $444.09 $444.09 <br />-Water Tanker, 2,500 Gal. $64.63 1 $64.63 $64.63 <br />-Flatbed Truck, 6x4, 45K GVW $69.84 1 $69.84 $69.84 <br />-Light Duty Pickup, 4x4, 314 T. $34.69 1 $34.69 $34.69 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $613.26 $613.26 <br />................::::::::::::::::::::::::::::.:::.:::::::::::::::::::::::::::::::::::::::::::::::::::::::.:::::::::.::::..:::..:...:..:..:.....:........................................................ <br />.............................................. <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br /> Nearest major city or town within project area region : Commerce City <br />Non- Total one-way travel distance : 2.0 miles <br />Roadable Roadable Average travel speed : 35.0 mph <br />Equipment Equipment <br />0.06 0.06 Total non-roadable mob/demob cost $4,726.84 <br />0.06 0.06 * two round trips with haul rig <br />1.00 NA Total roadable mob/demob cost ** : $70.09 <br />1.00 NA " one round trip, no haul rig <br />2.11 0.11 <br /> <br /> <br /> <br />. <br />............................... <br />...................... ....................:«.::.:Total ;: :... <br />lob time <br /> <br />.............::::::::::::::...... <br />............ ......:::.::.::hours <br />4.23 <br /> Total job cost : $4,797