PERMIT #.M-1980-244 <br />INSPECTOR'S INITIALS: BMK <br />INSPECTION DATE: Februarv 1 T. ?011 <br />OBSERVATIONS <br />1) The Division conducted a monthly monitoring inspection and quarterly water•sampling from the Arequa'.GW <br />mcinitoring/compl,iance wells and the under drain discharge locations. Present during the water sampling inspection was <br />Mr:`.Lawrence Myers. Present during the monitoring inspection of the valley leach facility `were" Mark Vanoni;& Timm <br />Comer from CC&V'and Joe H, ickey of Amec. <br />2) After.'purging the wells, the required four casing volumes,. a spilt sample-was collected for sulfate and wad cyanide`from <br />compliance well, CRMW 3A.&3B. Additional split"samples were. collected from•the valley leach( under. drain discharge, AG -1 <br />and south under:drain. All lower ponds and AG 1.5 were dry. All required. field measurements were recorded prior to <br />collecting samples: Samples collected were delivered to the Colorado Department of Health and Environment. <br />3) : Continued the inspection of-the Phase V valley leach facility. area,:which is still under-construction: Th'e.pregnant pond has <br />been-certified, and is'being.loaded,with.ore. Barren, solution is being. applied to the pond, to lower pond.volumes in phases <br />1 Il,and IV ponds. The ore storage area construction is expected to commence by early April, or sooner if`the weather <br />permits. All the temporary storm water diversion structures in place, delineating the lined and.unlined areas, of the Phase V <br />ore storage ar"ea;,were found to be in good repair. The following readings were collected from the.Phase V, high and Low <br />volume solution collection transducers. High Volume Solution Collection Transducer # 312 was at:17.2, #313'was at 17.29, <br /># 314;16.82 feet of hydrostatic head. Low volume solutions collection transducer# 1 was at 9.82 and # 2 .was at 9.9 inches of <br />hydrostatic head.,No,discharge from the low"volume solution discharge pipe was noted at the time the inspection. In fact <br />according to Timm Comer and Mark Vanoni, there had notbeen`a discharge from the pipe since application of barren <br />solution"to the pond,was approved:.. <br />4). Continued the inspection to the existing valley leach facilities'l,ll,11, & IV. They, were acfive.at the time of the inspection: <br />Storm.water drainage controls forthe facilities were found to be in good repair: Inspected the.Phase IVC perimeter ditch. It <br />Y Was-foundto be in good repair. While'in the area collected the following readings from the High and low volume solution <br />collection; transducers for Phase I;II,II & V. Phase I high volume solutioncollectior transducer # T.was recorded at 27.1,# 2 <br />was at 34.2`and #3.was'at31.9..Low volume solution collection transducer #1.was at 0.37 and #:2 was at 0:50: The two <br />piezometers for the pond were. recorded at 43.3 & 42.4 feet. Phase II and 111 High'Volume Solution" Collection Transducer fl <br />4.was recorded at 22.5, #5W as at 20.3 and # 6.was at 22.5. Low volume solution collection,transducer # fwas;at 0.09 and <br />#:2 was at 0.30. Piezometerfor the pond was recorded at 31.9.' Phase. IV higKvolume solution collectiontransducer'# 7 was <br />at44A # 8 was at 42.9, 09 was at 48.7 and # 10 was at,40 2. Low volume solution collection transducer# 1 was recorded at' <br />13:9 and # 2 was at,9 3-, inches of hydrostatic head:;All other transducer readings are in feetof hydrostatic head. Inspected <br />the external pond, it was holding water. One of the low volume solution collection pressure transducerreadout was not <br />- functioning; Number II was recorded at 11.2 inches of hydrostatic head. CC&V plans to replacethe:readout meter as soon <br />. ' as possible ; ' <br />5). Inspected the"Cresson pit area. All the surface water diversion structures were found to be in good repair. Active.mining <br />wasaaking place in both the main and south Cresson.pits,.at the time of :the inspection. Inspected the clay borrow area. It <br />was actively processing-clay in"anticipation of resumption of the phase V valley leach ore storage area construction. Storm <br />water drainage control for the borrow area were found to be in, good repair. <br />Page 2 of 4