My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-25_REPORT - C1981038 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981038
>
2011-04-25_REPORT - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:49 PM
Creation date
4/26/2011 1:42:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
4/25/2011
Doc Name
2010 Annual Subsidence Report
From
Bowie Resources, LLC
To
DRMS
Permit Index Doc Type
Subsidence Report
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2010 Production and Geologic Conditions <br />The Bowie No. 1 Mine suspended operations during December, 1997 and remained <br />idle throughout the calendar year. <br />Operation Unit Descriptions <br />Bowie No. 1 Mine has no operating units to report on during the calendar year. <br />Subsidence Impacts - 2010 <br />Selected subsidence monitoring stations established over the Pitkin Mesa pipeline were <br />monitored in June and December of 2010. <br />Wide- Spaced Monitoring Grid Station Summary <br />Through technical revision number 45, the DRMS approved a reduction in subsidence <br />monitoring. The wide spaced subsidence monuments, Sites 6, 14, 15, 16, DH 55, DH <br />65, DH 66, DH 68, 81, 82, 83 and 95 were not monitored during the year. <br />Pitkin Mesa Pipeline <br />Seven subsidence monitoring stations were established at locations along the Pitkin <br />Mesa Pipeline which overlies Panel C. Panel C development commenced in October <br />with twenty -four crosscuts completed by January 1, 1993. Panel C was mined utilizing <br />a partial extraction design intended to preclude the development of subsidence in order <br />to protect the pipeline. The subsidence monitoring stations along the pipeline are <br />. depicted on Map No. 2 -5. The stations were surveyed twice in 2010; June 23rd and <br />December 13th. The results of this survey are appended to this report. The 2010 <br />survey was conducted by Cragg Surveying. The Cragg survey will provide consistent <br />survey values in the future, which will show that this area is stable. Surveys will <br />continue approximately semi - annually until stability is documented. <br />Visual Monitoring 2010 <br />Visual subsidence monitoring is accomplished by periodic "walkovers" of recently mined <br />areas within the present permit area. Walkovers are generally done in conjunction with <br />survey monitoring due to the seasonal accessibility of the area. During the 2010 <br />monitoring season, visual monitoring consisted of visual inspections done while <br />performing survey monitoring and water monitoring. <br />Visual monitoring is concentrated over areas of retreat mining with particular emphasis <br />on areas mined under low overburden. Since the mine has now been idled in excess of <br />10 years, there are no areas of particular emphasis on which to concentrate visual <br />inspections. <br />Projected Subsidence Impacts - 2011 <br />Subsidence impacts during 2011 are projected to be minimal based upon subsidence <br />patterns established to date. No mining is currently projected for 2011. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.