Laserfiche WebLink
0 <br />-4- <br />12. Primar future P st-minin land use ( check one <br /> <br />Cropland(CR). Pasturcland(PL) General Agriculwre(GA) <br />R Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Rccrcation(RC) industrial/Commercial(IC) <br />Developed Water Resourccr4WR) M Solid Waste.Disposal(WD). <br />13. Primary argent land use check one : <br />Croptand(CR) Pastureland(PL). General Agriculture(GA) <br />? Rangeland(RL) Forestry(Fit) Wildlife Habitat(WL) <br />ltesidential(RS) Reereation(RC) Industrial/Commcrcial(IC) <br />Developed Water Rcsourccs(WIt) <br />14. Method orMinine; Briclly explain.mining method (d.g. trucklshove.l): <br />Truck and Loader hauling raw material to, the crusher. <br />15. On Site Processine: -2 Crushing/Screening <br />13:1 Briefly explain mining method (e.g. truck/shovel): <br />.crushing/screening and washing of raw material to make sellable material. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />Diesel Fuel <br />16. Description or Amendment or Conversion: <br />If you are omending or converting an existing operation, provide a brief narrative describing the proposed. change(s). <br />The existing permit is a sandstone au_tr y and is going to expanded to 153.04 for the purpose <br />of mining sand and gravel for road construction material. There will be portable plants. brought to <br />the site for processing of the raw material. There will be no blasting for the new operation..