Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 02A Page 3 of 3 <br />Haul Route: <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br />1 1000.00 0.00 4.00 4.00 2665 0.473 <br />Haul Time: 0.473 minutes <br />Rehirn Route- <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br />1 1000.00 0.00 4.00 4.00 2849 0.377 <br />Loading Tool unit <br />Production 550.72 <br />Truck Unit Production <br />220.49 <br />Optimal No. of Trucks: 2 <br />JOB TIME AND COST <br />Fleet size: 2 <br />Unit cost: $0.816 <br />Return Time: 0.377 <br />Total Truck Cycle Time: 2.918 <br />LCY/Hour Adjusted for job efficiency: _ <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 366.02 <br />Adjusted single truck/loader team production: 366.02 <br />Adjusted multiple truck/loader team production: 732.03 <br />LCY/Hour <br />LCY/Hour <br />Team(s) Total job time: 70.61 Hours <br />/LCY Total job cost: $42,177.69 <br />minutes <br />minutes <br />457.09 LCY/Hour <br />183.01 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />CIRCES Cost Estimating Software