Laserfiche WebLink
Loader Worksheet Cont'd Task # 05A Page 2 of 2 <br />Load Bucket Capacit <br />Total Travel Time: 0.8146 minutes <br />Total Cycle Time: 1.3296 minutes <br />Rated Capacity: 5.50 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - uniform aggregates to 1/8" (95-100%) 0.975 <br />Adjusted Capacity: 5.36 LCY <br />Job Condition Correction Factors <br />Site Altitude: 5320 feet <br />Source <br />Altitude Adj: 0.92 CAT HB) <br />Job Efficiency: 0.83 0 shift/day) <br />Net Correction: 0.76 multiplier <br />Unadjusted Hourly Unit Production: 241.99 LCY/Hour <br />Adjusted Hourly Unit Production: 184.79 LCY/Hour <br />Adjusted Hourly Fleet Production: 369.57 LCY/Hour <br /> <br />JOB TIME AND COST <br />e: 2 Loader(s) <br />t <br />i <br />Fl Total job time: 40.59 <br />s <br />z <br />ee <br />633 /LCY <br />st: $0 <br />it <br />U Total job cost: $9,490.00 <br />. <br />co <br />n <br />Hours <br />CIRCES Cost Estimating Software