My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-19_REVISION - M2005075
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005075
>
2011-04-19_REVISION - M2005075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:24 AM
Creation date
4/26/2011 9:28:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005075
IBM Index Class Name
REVISION
Doc Date
4/19/2011
Doc Name
Notice of surety increase (SI-01)
From
DRMS
To
Oldcastle SW Group, Inc.
Type & Sequence
SI1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 03A Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 (AVG.) <br />0.830 (1 SHIFT/DAY) <br />0.800 (FND-RF) <br />0.666 (CAT HB) <br />1.000 (CAT HB) <br />0.793 (CAT HB) <br />1.000 (PAT) <br />Net correction: 0.3156 <br />Adjusted unit production: <br />Adjusted fleet production: <br />513.48 LCY/hr <br />1026.96 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.309/LCY <br />Total job time: 50.33 Hours <br />Total job cost: $15,973.39 <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.