Laserfiche WebLink
Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Transport backfill material to pit highwalls <br />Site: Dick Casey Concr Pit Permit Action: 2011 Midterm Review Permit/Job#: M1978349 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 4/18/2011 County: Garfield <br />User: DMC <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Abbreviation: None <br />Filename: M349-002 <br />Shift basis: 1 per day <br />Truck Loader Team -Truck: Generic 10-12 cy, 6x4 <br />-Loader: CAT 972G (2002) <br />Support Equipment -Load Area: CAT 972G (2002) <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: NA <br />-Water Truck: NA <br />MnintPnnnneFnninment <br />%-UbL , Va?.,.,..... Truck lv LV u Loader Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 100 100 NA NA NA <br />Ownership cost/hour: $12.25 $27.23 $27.23 NA NA NA <br />Operating cost/hour: $49.41 $51.19 $51.19 NA NA NA <br />Ripper op. cost/hour: NA $0.00 $0.00 NA NA NA <br />Operator cost/hour: $0.00 $38.49 $38.49 NA NA NA <br />Unit Subtotals: $61.66 $116.91 $116.91 NA NA NA <br />Number of Units: 4 1 1 0 0 0 <br />Group Subtotals: Work: $363.55 Support: $116.91 Maint: $0.00 <br />Total work team cost/hour: $480.46 <br />Loose volume: 112,360 LCY <br />Source of estimated volume: Onsite observations/Rec. <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />MATERIAL QUANTITIES <br />Initial volume: 100 000 CCY Swell factor: 1.124 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds/LCY <br />Description: Sand and gravel - Dry <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 12.21 LCY <br />CIRCES Cost Estimating Software