Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Reclamation cost update <br />Site: Dick Casey Concr Pit Permit Action: 2011 Midterm Review <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 4/18/2011 County: Garfield <br />User: DMC <br />Agency or organization name: DRMS <br />TACK LIST (DIRECT COSTS) <br />Permit/Job#: M1978349 <br />Abbreviation: None <br />Filename: M349-000 <br /> <br /> <br />Task <br />01 <br />Descri tion <br />tructures <br />D Form <br />Used <br />DEMOLISH Fleet <br />Size <br />1 Task <br />Hours <br />40.00 <br />Cost <br />$59,431.34 <br />0 <br />002 emo s <br />ort backfill material to pit highwalls <br />s <br />T TRUCKI 2 153.49 $73,746.06 <br />003 ran <br />p <br />es to 3H:1 V <br />it slo <br />de <br />G DOZER 2 80.08 $31,802.55 <br />004 p <br />p <br />ra <br />rea <br />Ri <br />rocess RIPPER 2 7.30 $3,121.00 <br />005 , <br />p p <br />a <br />soil from stockpiles <br />ort to <br />ans <br />T TRUCKI 2 37.91 $13,781.52 <br />6 p <br />p <br />r <br />te to <br />soil <br />ib <br />Di <br />t DOZER 2 12.34 $4,902.15 <br />00 <br />007 p <br />r <br />u <br />s <br />tate affected area <br />V REVEGE 1 40.00 $95,634.49 <br />008 ege <br />Mobilize reclamation crew/equipment MOBILIZE 1 2.22 $5,881.91 <br />SUBTOTALS: 373.34 $288,301.02 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Performance bond: 1.05 <br />Job superintendent: 186.67 <br />Profit: 10.00 <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and/or administration: 5.00 <br /> <br />CONTINGENCY: 0.00 <br />$5,823.68 <br />$3,027.16 <br />$10,931.40 <br />$28,830.10 <br />$48,612.34 <br />$336,913.36 <br />Total = 500.00 <br />Total = $0.00 <br />$16,845.67 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $65,958.01 <br />TOTAL BOND AMOUNT (direct + indirect) = $354,259.03