Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Grade <br />Site: Dick Casey Concr Pit <br />PROJECT IDENTIFICATION <br />Task #: 003 <br />Date: 4/18/2011 <br />User: DMC <br />pes to 3H: 1V <br />Permit Action: 2011 Midterm Review <br />State: Colorado <br />County: Garfield <br />Agency or organization name <br />HOURLY EQU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />C test Breakdown: <br />DRMS <br />[PMENT COST <br />Cat D9R - 9U (2005) <br />405 <br />Universal <br />NA <br />1 per day <br />(CRG) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Utilization <br />$49.19 NA <br />$110.89 100 <br />$0.00 0 <br />$38.49 NA <br />$198.57 <br />$397.14 <br />MATERIAL QUANTITIES <br />Initial Volume: 100,000 <br />Swell factor: 1.124 <br />Loose volume: 112,360 LCY <br />Source of estimated volume: Onsite observations / Rec. D <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 2,222.9 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />15% <br />5,320 feet <br />2,9001bs/LCY <br />Weight description: Sand and gravel - D <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.200 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Permit/Job#: M1978349 <br />Abbreviation: None <br />Filename: M349-003 <br />CIRCES Cost Estimating Software