Laserfiche WebLink
Task # 016 Page 2 of 2 <br />Reveg Worksheet Cont'd <br />MULCHING and MISCELLANEOUS <br />Materials <br />Units / <br />Description Acre Unit Cost / Unit Cost /Acre <br />$ <br />Total Mulch Materials Cost/Acre <br />$0.00 <br />Cost /Acre <br />Total Mulch Application Cost/Acre I $0.00 <br />NURSERY STOCK PLANTING <br /> <br />Common Name No / <br />Acre <br />Buffaloberry, Russet 44 <br />Cottonwood, <br />Narrowleaf <br />Willow, Sandbar 44 <br /> <br />44 <br />Sumac, Smooth 44 <br /> <br />JOB TIME AND COST <br /> Planting <br />Type and Size Cost <br />Tubling, 3 cu. in. container $1.72 <br />{BRI} <br />Bare root seedling, 11-16 inch ht. $1.64 <br />(MEANS) <br />Bare root seedling, 11-16 inch ht. $1.64 <br />(MEANS) <br />Tubling, 3 cu. in. container $4.12 <br />No. of Acres: 1 <br />Estimated Failure Rate: 25% <br />*Selected Replanting Work Items: NURSERY <br />Initial Job Cost: $401.28 <br />Reseeding Job Cost: $100.32 <br />Total Job Cost: $501.60 <br />Job Hours: 10.00 <br />Totals Nursery Stock Cost / Acre 1 $401.28 <br />Fertilizer <br />Pellet Cost Cost /Acre <br />$2.40 $75.68 <br /> <br />$2.40 $72.16. <br /> <br />$2.40 $72.16 <br />$2.40 $181.28 <br />Cost /Acre: $401.28 <br />Cost /Acre*: $401.28 <br />CIRCES Cost Estimating Software