Laserfiche WebLink
Reveg Worksheet Cont'd Task # 015 <br />MULCHING and MISCELLANEOUS <br />Materials Units / <br />Description Acre <br />NURSERY STOCK PLANTING <br />Page 2 of 2 <br />Unit Cost / Unit <br />Cost /Acre <br /> No / <br />Type and Size Planting <br />Cost Fertilizer <br />Pellet Cost Cost /Acre <br />Common Name Acre <br />i <br />72 <br />$1 <br />$2.40 <br />$254.56 <br />Buffaloberry, Russet 148 ner <br />Tubling, 3 cu. in. conta . <br /> <br />Cottonwood, <br />148 BRI <br />Bare root seedling, 11-16 inch ht. <br />$1.64 <br />$0.00 <br />$242.72 <br />Narrowleaf <br />148 (MEANS) <br />Bare root seedling, 11-16 inch ht. <br />$1.64 <br />$2.40 <br />$242.72 <br />Willow, Sandbar <br /> <br />Sumac, Smooth <br />148 (MEANS) <br />Tubling, 3 cu. in. container <br />$4.12 <br />$2.40 <br />$609.76 <br />Totals N <br />JOB TIME AND COST <br />No. of Acres: I <br />Estimated Failure Rate: 25% <br />*Selected Replanting Work Items: NURSERY <br />Initial Job Cost: $1,349.76 <br />Reseeding Job Cost: $337.44 <br />Total Job Cost: $1,687.20 <br />Job Hours: 10.00 <br />Stock Cost / Acre 1 $1,349.76 <br />Cost /Acre: $1,349.76 <br />Cost /Acre*: $1,349.76 <br />CIRCES Cost Estimating Software <br />Total Mulch Materials Cost/Acre I I $0.00 J