Laserfiche WebLink
Bulldozer Worksheet Cont'd <br />Visibility: 1.000 <br />Job efficiency: 0.830 <br />Spoil pile: 0.800 <br />Push gradient: 1.329 <br />Altitude: 1.000 <br />Material Weight: 1.438 <br />Blade type: 1.000 <br />Net correction: 1.1421 <br />Adjusted unit production: 2,538.77 LCY/hr <br />Adjusted fleet production: 2538.77 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.078/LCY <br />Total job time: 1.38 Hours <br />Total job cost: $273.75 <br />Task # 012 <br />(1 T AY) <br />f(FND-RRFF) <br />) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br /> <br />Page 2 of 2 <br />CIRCES Cost Estimating Software