Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 009 <br />Visibility: 1.000 <br />Job efficiency: 0.830 <br />Spoil pile: 0.800 <br />Push gradient: 1.329 <br />Altitude: 1.000 <br />Material Weight: 0.793 <br />Blade type: 1.000 <br />Net correction: 0.4724 <br />Adjusted unit production: 1,050.10 LCY/hr <br />Adjusted fleet production: 2100.2 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.189/LCY <br />Total job time: 2.48 Hours <br />Total job cost: $983.72 <br />(AVG.) <br />1 SHIFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 2 of 2 <br />CIRCES Cost Estimating Software