Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: <br />Site: Chambers Pit <br />Permit Action: 2011 Midterm Review <br />Permit/Job#: M1979205 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 4/12/2011 County: Garfield <br />User: DMC <br />Agency or organization name: DRMS <br />HOURLY EQU. <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />C t Breakdown: <br />rraatP wetlands shelf AM2 Mine Area I <br />IPMENT COST <br />Cat D9R - 9U (2005) <br />405 <br />Universal <br />-NA <br />1 per day <br />(CRG) <br />os <br />Utilization % <br />Ownership Cost/Hour: $49.19 NA <br />Operating Cost/Hour: $110.89 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.49 NA <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $198.57 <br />MATERIAL QUANTITIES <br />Initial Volume: 14,665 <br />Swell factor: 1.124 <br />Loose volume: 16,478 LCY <br />Source of estimated volume: 3.03 acres/3 ft. <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 1,308.1 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,320 feet <br />00 lbs/LCY <br />Weight description: Sand and gravel - Dr <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.) <br />Abbreviation: None <br />Filename: M205-004 <br />CIRCES Cost Estimating Software