Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: <br />Site: Chambers Pit <br />Hi hwall reduction AM2 Mining Area 1 <br />Permit Action: 2011 Midterm Review Permit/Job#: M1979205 <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 4/12/2011 <br />User: DMC <br />State: Colorado <br />County: Garfield <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9U (2005) <br />Horsepower: 405 <br />Blade Type: Universal <br />Attachment: <br />Shift Basis: <br />Data Source: <br />NA <br />1 per day <br />(CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $49.19 NA <br />Operating Cost/Hour: $110.89 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.49 NA <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $397.14 <br />MATERIAL QUANTITIES <br />Initial Volume: 16,667 <br />Swell factor: 1.099 <br />Loose volume: 18,315 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />2,222.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-15% <br />5,320 feet <br />3,4001bs/LCY <br />Sand and gravel - Wet <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.) <br />Abbreviation: None <br />Filename: M205-002 <br />CIRCES Cost Estimating Software