Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 001 Page 3 of 3 <br />14 1 Rn„ta- <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> (min) <br />1 1850.00 0.00 4.00 4.00 2665 0.792 <br />Retnrn RnntP- <br />Haul Time: 0.792 <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br />1 1850.00 0.00 4.00 4.00 2849 0.675 <br />Return Time: 0.675 <br />Total Truck Cycle Time: 3.535 <br />Loading Tool unit <br />Production 550.72 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />182.01 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: _ <br />Adjusted hourly truck team production: 302.14 <br />Adjusted single truck/loader team production: 302.14 <br />Adjusted multiple truck/loader team production: 302.14 <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $0.79' <br />Team(s) Total job time: 2.65 Hours <br />/LCY Total job cost: $636.08 <br />minutes <br />minutes <br />minutes <br />457.09 LCY/Hour <br />151.07 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />CIRCES Cost Estimating Software