Laserfiche WebLink
Pagel of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: <br />Site: Chambers Gravel Pit <br />Truck topsoil from Glen Pit stockpile to east pond bank <br />Permit Action: 2011 Midterm Review Permit/Job#: M1979075 <br />User: DMC <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 4/13/2011 County: Garfield <br />DRMS <br />Shift basis: 1 per day <br />Truck Loader Team -Truck: Generic 10-12 cy, 6x4 <br />-Loader: CAT 972G (2002) <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: NA <br />-Water Truck: NA <br />f'-+ 12---L.L...- TmnL/T -4- T- Rnnnnrt Fnninment Maintenance F.auinment <br /> Truck Loader Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 100 NA NA NA NA <br />Ownership cost/hour: $12.25 $27.23 NA NA NA NA <br />Operating cost/hour: $49.41 $51.19 NA NA NA NA <br />Ripper op. cost/hour: NA $0.00 NA NA NA NA <br />Operator cost/hour: $0.00 $38.49 NA NA NA NA <br />Unit Subtotals: $61.66 $116.91 NA NA NA NA <br />Number of Units: 2 1 0 0 0 0 <br />Group Subtotals: Work: $240.23 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $240.23 <br />MATERIAL QUANTITIES <br />Initial volume: 800 CCY Swell factor: 1.000 <br />Loose volume: 800 LCY <br />Source of estimated volume: Onsite observations <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 1,600 Pounds/LCY <br />Description: Top Soil <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 22.13 LCY <br />Abbreviation: None <br />Filename: M075-001 <br />CIRCES Cost Estimating Software