My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-08_REPORT - C1982056
DRMS
>
Day Forward
>
Report
>
Coal
>
C1982056
>
2011-04-08_REPORT - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:29 PM
Creation date
4/21/2011 9:39:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REPORT
Doc Date
4/8/2011
Doc Name
1st Quarter 2011 Refuse Pile
From
Brian Len, NWCC, Inc
To
DRMS & Jerry Nettleton
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
haul road to Areas 2, 3 and 4 of the refuse pile had not been plowed and was covered with snow and was <br />not passable at the time of our site visit. <br />It did not appear that Bower Brothers Construction had stockpiled any new topsoil and cover materials. In <br />addition, they had not completed any further construction of the new haul road to the south of the existing <br />pond or the underdrain during this period. <br />As suggested, the water levels in the monitor wells installed on October 23, 1997 and December 9, 1999 <br />were measured during this quarter on a monthly basis. A table and graphs showing the monthly water <br />levels are attached. <br />We were advised that the wash plants had produced approximately 123,447 tons of waste coal during the <br />month of January 2011: approximately 103,664 tons during February 2011: and approximately 62,253 tons <br />during March 2010. It is our understanding that the fines being produced at the wash plant, which consists <br />of approximately 10 to 20 percent of the total materials being produced, are being pumped underground <br />into the mine. <br />Based on our limited observations, it appears that the pile is currently being constructed and maintained in <br />general accordance with the project specifications and plans submitted under 2.05.3(8) and that the <br />potential hazard to human life and property at the site in its present condition is minimal. This report <br />fulfills the quarterly inspection requirements as specified by Rules 4.09.1(11)(a), 4.09.1(11)(b), 4.10.2(2)(a) <br />and 4.10.2(2)(b). <br />If you have any questions regarding this report or our observations, please contact this office. <br />Sincerely, <br />NWCC, INC., <br />Timothy S. Travis, P.E. <br />Reviewed by Brian D. Len, <br />cc: Jason Musick - <br />ZP750 <br />?S OL <br />- CDRM&S <br />inh Number 99-3983 NWCC. inc. PBee 2
The URL can be used to link to this page
Your browser does not support the video tag.