Laserfiche WebLink
EXHIBIT F - Reclamation Plan Map <br />Reclamation map <br />See the attached mine reclamation map (Exhibit F) showing the proposed final re- grading of all disturbed areas. <br />The reclamation final grading will restore the area to grazing rangeland. It is anticipated that no stormwater ponds will <br />be constructed or remain on site; any runoff entering the pit area will infiltrate the base of the pit. <br />It is anticipated that the average thickness of overburden is minimal, however, overburden and excavated soil materials <br />unsuitable for road construction will be used to backfill excavated areas and for re- grading the site to stable slopes. <br />Stockpiled topsoil will be placed on re- graded areas prior to seeding with approved native grass seed mixes. <br />MADAVE B\Ashbaugh\DRMS permit\AmendedApplication & Exhibits.doc <br />4/14/2011 <br />