Laserfiche WebLink
V V WC ENGINEERING <br />April 18, 2011 <br />611 Skyline Road - Laramie, Wy 62070 - (307) 742-0031 <br />FAX (307) 721-2913 - E-mail: infolar@wwcengineering.com <br />Janet Binns <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203-2273 <br />APR 2. ? 2Q11 <br />,,,ion, <br />Divis?ui i; v4to? <br />RE: Edna Mine; First Quarter 2011 Impoundment Inspection Report <br />tAIning a"d <br />Dear Janet Binns: <br />This letter constitutes the First Quarter 2011 Impoundment Inspection Report for the Edna Mine; <br />Permit No. C-80-001. This report covers the time period from January 1, 2011 to March 31, <br />2011. The inspections were performed on February 17, 2011 by Field Inspector Chris Miller. <br />The site was covered with snow. All structures were functioning as designed at inspection. <br />The Impoundment Location Map details the location of each impoundment inspected <br />(Attachment A). Quarterly Pond Inspection Reports document water level, sediment level, <br />outflow, and required maintenance cited per inspection (Attachment B). As described on the <br />2011 Maintenance List, there is currently no required maintenance at the Edna Mine (Attachment <br />C). <br />Should you have any questions regarding this material, please contact me at your convenience. <br />Sinc ely, <br />Troy Summers <br />Project Manager <br />TNS <br />Attachments (A, B & C) <br />File: 99-144 <br />cc: CMI <br />Permit