My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-19_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2011-04-19_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:43 PM
Creation date
4/20/2011 9:10:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
4/19/2011
Doc Name
2011 Midterm Review Cost Estimate
From
Jim Stark
To
Mike Boulay
Type & Sequence
MT6
Email Name
JRS
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HYDRAULIC EXCAVATOR WORK <br />Task description: Regrade Lower Power Line Access Road <br />Permit Action: MT-06 - Road <br />Site: Elk Creek Mine Reclamation Tasks Permit/Job#: C1981022 <br />PROJECT IDENTIFICATION <br />Task #: 041 . State: Colorado Abbreviation: None <br />Date: 14-Apr-11 County: Delta Filename: C022-041 <br />User: JRS <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 330C L <br />Attachment 1: ROPS Cab <br />DRMS <br />Cost Breakdown: <br />Horsepower: 244 <br />Weight (MT): 33.72 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br /> Utilization % <br />Ownership Cost/Hour: $37.65 NA <br />Operating Cost/Hour: $63.06 100 <br />Operator Cost/Hour: $38.67 NA <br />Total Unit Cost/Hour: $139.39 <br />Total Fleet Cost/Hour: $139.39 <br />MATERIAL OUANTITIES <br />Initial volume: 7,500 CCY Swell factor: 1.125 <br />Loose volume: 8,438 LCY <br />Source of estimated volume: Appendix E-1; Map S-038 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />Load Bucket Capacity <br />AVERAGE <br />AVERAGE <br />0.321 minutes <br />Bucket Size Class: Small <br />Rated Capacity: 1.12 LCY (heaped) <br />Bucket Fill Factor: 0.850 Hard, tough clay (80% - 90%) 0.850 <br />Adjusted Capacity: 0.95 LCY <br />Job Condition Correction Factors Site Altitude: 6400 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 177.94 LCY/Hour <br />Adjusted Hourly Unit Production: 147.69 LCY/Hour <br />Adjusted Hourly Fleet Production: 147.69 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time: 57.13 Hours <br />Unit cost: $0.944 <br />/LCY Total job cost: $7,963.00 <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.