My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-19_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2011-04-19_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:43 PM
Creation date
4/20/2011 9:10:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
4/19/2011
Doc Name
2011 Midterm Review Cost Estimate
From
Jim Stark
To
Mike Boulay
Type & Sequence
MT6
Email Name
JRS
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Elk Creek Mine <br />BULLDOZER RIPPING WORK <br />Cover Material for East Refuse Pile <br />Permit Action: MT-06 - Compaction <br />and Ripping Tasks <br />PROJECT IDENTIFICATIOI\ <br />Task #: 033 <br />Date: 14-Apr-11 <br />User: JRS <br />State: Colorado <br />County: Delta <br />Permit/Job#: C1981022 <br />Abbreviation: None <br />Filename: C022-033 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10R - IOSU (2005) <br />Ripper Attachment: 1-Shank Ripper <br />Cost Breakdown: <br />Horsepower: 570 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br /> Utilization % <br />Ownership Cost/Hour: $80.89 NA <br />Operating Cost/Hour: $147.96 100 <br />Ripper Operating Cost/Hour: $11.24 100 <br />Operator Cost/Hour: $38.49 NA <br />Total Unit Cost/Hour: $278.58 <br />Total Fleet Cost/Hour: $835.74 <br />MATERIAL QUANTITIES Selected estimating method: Seismic <br />Alternate Methods: <br />Seismic: 14,100 BCY Bank Volume: 14,100 BCY Midrange <br />Area: NA acres Rip Depth (ft): NA Volume: NA BCY or CCY <br />Source of estimated quantity: Division Estimate <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: 4,000 feet/second <br />Area: <br />Average Ripping Depth: NA mph <br />Average Ripping Width: NA degrees <br />Average Ripping Length: NA feet <br />Average Dozer Speed: NA feet <br />Average Maneuver Time: NA feet <br />Production per unit area: NA acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 1,777.80 Cu. yds./hr <br />Site Altitude: 6,200 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Adjusted Hourly Unit Production: 1,475.57 Cu. yds./hr <br />Adjusted Hourly Fleet Production: 4,426.72 Cu. yds./hr <br />JOB TIME AND COST <br />Fleet size: 3 Grader(s) Total job time: 3.19 <br />Unit cost: $0.189 <br />Per cu. yd. Total job cost: $2,662.00 <br />Hours <br />C[RCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.