My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-19_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2011-04-19_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:43 PM
Creation date
4/20/2011 9:10:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
4/19/2011
Doc Name
2011 Midterm Review Cost Estimate
From
Jim Stark
To
Mike Boulay
Type & Sequence
MT6
Email Name
JRS
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPACTION WORK <br />Task description: Compact Steep Slope Areas and Coal Stockpile Material <br />Permit Action: MT-06 - Compaction <br />Site: Elk Creek Mine and Ripping Tasks Pennit/Job#: C1981022 <br />PROJECT IDENTIFICATIOIS <br />Task #: 030 <br />Date: 14-Apr-11 <br />User: JRS <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 815F Horsepower: 240 <br />Compactor Type: Soil - tamping foot Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $40.03 NA <br />Operating Cost/Hour: $63.29 100 <br />Operator Cost/Hour: $23.56 NA <br />Total Unit Cost/Hour: $126.88 <br />Total Fleet Cost/Hour: $126.88 <br />MATERIAL OUANTITIES <br />Loose volume: 184,000 LCY Shrinkage factor: 0.870 <br />Compacted volume: 160,080 CCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated shrinkage factor: Cat Handbook <br />HOURLY PRODUCTION <br />Compacted width per pass (W): <br />Average Compactor Speed (S): <br />Compacted thickness of each lift (L): <br />Conversion Constant (C): <br />Required number of machine passes (P): <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Unadjusted hourly production = (W x S x L x C) / P <br />6.42 feet <br />4.00 mph <br />10.00 inches <br />16.3 (5,280ft./12in./27cu.ft.) <br />5 passes <br />837.17 CCY/hour <br />Site Altitude: 6,200 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.8300 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) <br />Unit cost: $0.183 per CCY <br />694.85 CCY/Hour <br />694.85 CCY/Hour <br />Total job time: 230.38 Hours <br />Total job cost: $29,231.00 <br />CIRCES Cost Estimating Software <br />Abbreviation: None <br />Filename: C022-030
The URL can be used to link to this page
Your browser does not support the video tag.