Laserfiche WebLink
Page 1 of 2 <br />Task description: <br />Site: Elk Creek Mine <br />SCRAPER TEAM WORK <br />Move Fill Material from Elk Creek Mine to Elk Creek Faciliti <br />PROJECT IDENTIFICATION <br />Permit Action: MT-06 - Backfilling <br />and Rough Grading <br />Tasks <br />Task #: 006 State: Colorado <br />Date: 14-Apr-11 County: Delta <br />User: IRS <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT <br />COSTShift basis: 1 per day <br />iption <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Scraper Work Team Sunnort Eauinment Maintenance Eauipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA NA NA NA <br />Ownership cost/hour: $91.74 NA NA NA NA NA <br />Operating cost/hour: $190.61 NA NA NA NA NA <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cost/hour: $24.95 NA NA NA NA NA <br />Unit Subtotals: $307.30 NA NA NA NA NA <br />Number of Units: 2 0 0 0 0 0 <br />Group Subtotals: Work: $614.60 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $614.60 <br />MATERIAL QUANTITIES <br />Initial volume: 72,000 CCY Swell factor: 1.125 <br />Loose volume: 81,000 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,650 lbs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 75,000 pounds <br />Payload Capacity: 28.30 LCY <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />Adjusted Capacity: 28.30 LCY <br />Permit/Job#: C1981022 <br />Abbreviation: None <br />Filename: C022-006 <br />CIRCES Cost Estimating Software