My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-19_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2011-04-19_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:43 PM
Creation date
4/20/2011 9:10:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
4/19/2011
Doc Name
2011 Midterm Review Cost Estimate
From
Jim Stark
To
Mike Boulay
Type & Sequence
MT6
Email Name
JRS
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />Task description: <br />Site: Elk Creek Mine <br />SCRAPER TEAM WORK <br />Move Fill Material from Elk Creek Mine to Elk Creek Faciliti <br />PROJECT IDENTIFICATION <br />Permit Action: MT-06 - Backfilling <br />and Rough Grading <br />Tasks <br />Task #: 006 State: Colorado <br />Date: 14-Apr-11 County: Delta <br />User: IRS <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT <br />COSTShift basis: 1 per day <br />iption <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Scraper Work Team Sunnort Eauinment Maintenance Eauipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA NA NA NA <br />Ownership cost/hour: $91.74 NA NA NA NA NA <br />Operating cost/hour: $190.61 NA NA NA NA NA <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cost/hour: $24.95 NA NA NA NA NA <br />Unit Subtotals: $307.30 NA NA NA NA NA <br />Number of Units: 2 0 0 0 0 0 <br />Group Subtotals: Work: $614.60 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $614.60 <br />MATERIAL QUANTITIES <br />Initial volume: 72,000 CCY Swell factor: 1.125 <br />Loose volume: 81,000 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,650 lbs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 75,000 pounds <br />Payload Capacity: 28.30 LCY <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />Adjusted Capacity: 28.30 LCY <br />Permit/Job#: C1981022 <br />Abbreviation: None <br />Filename: C022-006 <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.