Laserfiche WebLink
• <br />Bowie Resources, LLC <br />Bowie No. 2 Mine <br />2010 Annual Hydrology Report <br />Initiated 9/15/2010 <br />Activated <br />Date 9/15/2010 <br />• <br /> <br />RNIMUNITS <br />CWI-DH-60 <br />Upper B Seam <br />Elevation - 7960 <br />Depth -1073' <br />Summary Information <br />Baseline Operation <br />Min Ave Max Min Ave Max <br />Static Water Level Feet 1073 1073 1073 <br />Water Elevation Feet 6887 6887 6887 <br /> <br />FieldComment D <br />ph su V <br />Conductivity umhos/cm <br />Temperature Celsius <br />t ' <br />9 UNITS <br />Bicarbonate mg/L <br />Carbonate mg/L <br />Chloride mg/L <br />Conductivity umhos/cm <br />Hardness m /L <br />Nitrate-Nitrite mg/L <br />Ammonia mg/L <br />pH su <br />Phosphate mg/L <br />ResidueFilterable-TDS mg/L <br />Sulfate mg/L <br />Arsenic mg/L <br />Cadmium mg/L <br />Calcium mg/L <br />Iron (Dissolved) mg/L <br />Iron (Total) mg/L <br />Magnesium mg/L <br />Manganese (Dissolved) mg/L <br />Manganese (Total) mg/L <br />Mercury mg/L <br />Selenium mg/L <br />Sodium mg/L <br />Zinc mg/L <br />Ground Water <br />The area of concern for monitoring point CWI-DH-60 has not been affected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />CWI-DH-60 is located southwest of projected mining. It will not be impacted by Bowie No. 2 Mine workings. <br />CWI-DH-60 was cemented to the bottom of the upperB-Seam during September 2090. <br />Baseline Information Collection initiated on 9/15110 and not yet considered complete. <br />Point CWI-DH-60 has not been influenced by mining. <br />Figure No. 151