Laserfiche WebLink
Bowie Resources, LLC Surface Water <br />Bowie No. 2 Mine <br />2010 Annual Hydrology Report C-1 <br />North Fork - Drainage System <br />Elevation - 5910 <br />Initiated 6/29/2000 6/29/2000 6/29/2000 6/29/2000 <br />Activated <br />Date 11/20/2010 9/28/2010 7/2/2010 6/4/2010 <br />Summary Information <br />Baseline Operation <br />I IAIITQ Min A- MAY Min Ave MAY <br />Flow PM 0 0 0 0 0 0 0 <br />FieldComment Dry Dry Dry Dry <br />ph E <br />Conductivity cm <br />Temperature • <br /> <br />Lit} ;. <br />?.,I t l (k }J <br />UNITS <br />Bicarbonate mg/L <br />Chloride mg/L <br />Conductivity umhos/cm <br />Hardness mg/L <br />Nitrate-Nitrite mg/L <br />Oil and Grease mg/L <br />pH su <br />Phosphate mg/L <br />Residue Filterable (TDS) mg/L <br />ResidueNon Filterable (TSS) mg/L <br />SAR <br />Sulfate mg/L <br />Aluminum mg/L <br />Arsenic mg/L <br />Cadmium mg/L <br />Calcium mg/L <br />Copper mg/L <br />Iron (Total) mg/L <br />Lead <br />Magnesium <br />Manganese (Total) <br />Mercury <br />Molyebdenum d <br />Selenium <br />Sodium <br /> <br />Zinc mg/L <br />The area of concern for monitoring point C-1 has not been affected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />The C-1 monitoring point is a Culvert under the Union Pacific Railroad. It is located 40 feet northeast of the Terror Creek Loadout <br />mainline switch. <br />• <br />Baseline Information Collection initiated on 6/29/00 and not yet considered complete. <br />Point C-1 has not been influenced by mining. <br />Figure No. 84