Laserfiche WebLink
Bowie Resources, LLC Surface Water <br />Bowie No. 2 Mine <br />2010 Annual Hydrology Report Deer-up <br />Canal - Deer Trail Ditch <br />Elevation - 6960 <br />Initiated 6/14/1995 6/14/1995 6/14/1995 6/14/1995 <br />Activated 3130/1997 3/30/1997 3/30/1997 3/30/1997 <br />Date 11/30/2010 9/8/2010 6/15/2010 3/23/2010 <br />Summary Information <br />Baseline Operation <br />UNITS Min Ave Max Min Ave Max <br />Flow CFS 0.8 2.4 8.0 0.2 1.7 4.8 0.93 1.86 1.86 1.11 <br />Water Level in Flume Feet 0.23 0.44 1.00 0.08 0.36 0.72 0.25 0.39 0.39 0.28 <br />FieldComment <br />ph su 6.4 8.5 9.1 7.4 8.4 9.1 8.6 8.8 8.4 8.1 <br />Conductivity umhos/cm 70 286 668 50 190 320 250 260 150 230 <br />Temperature Celsius 0.8 11.4 20.3 0.2 9.8 20.7 0.3 14.5 16.2 2.2 <br />DO mg/L 0.0 3.5 7.7 0.0 8.9 11.7 11 9.1 7.3 11.2 <br />f? ,I <br />u <br />C? <br />Baseline Information for Point Deer-up is derived from events beginning on 6/14/95 through 3130/97. <br />Point influenced by mining on 3130/97. <br />Figure No. 105 <br />The upper end of Deer Trail Ditch is monitored at the headgate located on Hubbard Creek. This monitoring point is fitted with a 2' Parshall Flume.