Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 212 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 (AVG.) <br />0.830 (1 SHIFT/DAY) <br />1.000 (DOZ-OC) <br />1.000 (CAT HB) <br />1.000 (CAT HB) <br />0.793 (CAT HB) <br />1.000 (PAT) <br />Net correction: 0.4443 <br />Adjusted unit production: <br />Adjusted fleet production: <br />937.70 LCY/hr <br />937.7 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.212/LCY <br />Total job time: 1.96 Hours <br />Total job cost: $388.55 <br />CIRCES Cost Estimating Software