My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-19_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2011-04-19_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:43 PM
Creation date
4/19/2011 12:19:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
4/19/2011
Doc Name
Preliminary Adequacy Review
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
TR68
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Summary Sheet - B-Seam Dewatering System <br />Site: Deserado Mine Permit Action: Technical Revision 68 Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 210 State: Colorado <br />Date: 11-Apr-11 County: Rio Blanco <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description Form <br />Used Fleet <br />Size Task <br />Hours <br />Cost <br />211 Remove Fence at B-Seam Dewatering System DEMOLISH 1 16.00 $3,505.92 <br />212 Regrade Four Dewatering Ponds DOZER 1 1.96 $388.55 <br />213 Regrade Last Chance Pond DOZER 1 0.40 $80.18 <br />214 Regrade Baffles in Artificial Wetlands DOZER 1 1.18 $256.94 <br />215 Replace Topsoil from Stockpile to Dewatering <br />Ponds DOZER 1 0.38 $82.67 <br />216 Replace Topsoil from Stockpile Last Chance Pond DOZER 1 0.15 $32.01 <br />217 Reseed B-Seam Dewatering System Area REVEGE 1 6.94 $2,518.07 <br />SUBTOTALS: 27.01 $ $6,864.34 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Performance bond: 1.05 <br />Job superintendent: 13.51 <br />Profit: 10.00 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$138.66 <br />$72.08 <br />$790.85 <br />$686.43 <br />$1,688.02 <br />$8,552.36 <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 4.25 Total = $363.48 <br />Reclamation management and/or administration: 3,25 $277.95 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $2,329.45 <br />TOTAL BOND AMOUNT (direct + indirect) = $9,193.79 <br />Abbreviation: None <br />Filename: C018-210
The URL can be used to link to this page
Your browser does not support the video tag.