My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-18_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2011-04-18_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:41 PM
Creation date
4/18/2011 1:35:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
4/18/2011
Doc Name
Review Letter
From
Division of Water Resources
To
DRMS
Type & Sequence
TR108
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 18, 2011 <br />2 <br />are later used for water monitoring wells are exempt from the Water Well Construction Rules, 2 <br />CCR 402-2 (WWCR). Permitting types that may be applicable to the site include: <br />1) Monitoring Hole Notice: A notice provided to the SEO that water monitoring wells <br />are going to be constructed within a specific quarter-quarter. The exact <br />location/number of wells is not required nor is there a fee for this form. However, <br />these wells must either be plugged and abandoned or permitted as monitoring wells <br />within 1 year of construction. Wells constructed under Monitoring Hole Notices (MH <br />Notices) cannot be converted to production wells at a later date. Please read the MH <br />Notice form for further details and requirements. <br />2) Monitoring Well Permit: A permit to monitor water quality/levels for an extended <br />period of time. Though wells constructed under monitoring well permits (in <br />accordance with the WWCR) can potentially be converted to production wells at a <br />later date, wells constructed under MH Notices and converted to monitoring wells <br />cannot. Please note that if you choose to convert an exploration borehole to a water <br />monitoring well, it will, at the time of conversion, require a monitoring well permit <br />through the SEO. The SEO recommends that, if you drill a well with the intent of <br />monitoring water quality/quantity levels for over 1 year, you obtain a monitoring well <br />permit prior to constructing the well and construct it in accordance with the WWCR to <br />maximize the long-term use of the well. <br />3) Dewatering Well Permit: A permit to conduct long-term dewatering operations. All <br />long-term dewatering operations require a dewatering well permit. The scope of a <br />dewatering well is limited to dewatering only; use of the water beyond dewatering is <br />not allowed under this permit. A well constructed under an MH Notice can be <br />converted to a dewatering well. If you plan on using the water acquired from <br />dewatering operations after the initial dewatering (this includes uses such as dust <br />suppression, potable water supply, operational uses) a non-exempt permit must be <br />obtained and the well will be considered a production well. A well drilled under an <br />MH Notice will not be eligible for conversion to these types of uses. <br />4) Production Well (exempt): These permits are assumed to be non-injurious to the <br />stream system so their use does not require augmentation water. However, their <br />uses are also very limited. These wells can be permitted for drinking and sanitary <br />purposes inside a commercial business (up to 0.33 of/yr) or up to 3 single family <br />dwellings, 1 acre of lawn and garden irrigation, and the watering of the user's non- <br />commercial domestic animals. They are permitted as the only exempt production <br />well on the parcel. Wells drilled under MH Notices cannot be permitted for these <br />uses. <br />5) Production Well (non-exempt): These wells are assumed to be injurious to the <br />stream system; in general, if the operation is in an overappropriated stream system <br />an augmentation plan will be required to operate under this type of permit. These <br />well permits cover most other water uses. This includes water used for site <br />operations, irrigation or outdoor uses, and dewatering with supplemental beneficial <br />uses. Also, any ponds or operation pits that intercept ground water are considered <br />wells; they will require non-exempt permits. Multiple non-exempt wells can exist on a <br />parcel. Wells drilled under MH Notices cannot be permitted for these uses. <br />This list is a general summary only, it is not intended to be all inclusive nor does it list all <br />of the requirements and limitations of the permit types mentioned. More information on these <br />permit types and the specific requirements and limitations associated with each is available on
The URL can be used to link to this page
Your browser does not support the video tag.