My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-18_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-04-18_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:41 PM
Creation date
4/18/2011 9:58:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
4/18/2011
Doc Name
Letter, Application and Public Notice
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR90
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />0?9 Colowyo Coal Company <br />- <br />O 5731 State Highway 13 <br />M <br />k <br />CO 81641 <br /> ee <br />er, <br />0-3 T:970-824-1573 <br />Pals <br />0 April 13, 2011 <br />Fa???`v?D <br />????` 18 Zp11 <br />i'eclamawn, <br />,f iV 1.. Jai q dgafew <br />V M,nin9 "n v-' <br />Mrs. Janet Binns <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RECEIVED <br />APR 18 Z011 <br />Division or neciamalion, <br />Mining and Safely <br />RE: Technical Revision - 90, Small Area Exemption and Tri-State Powerline Right of <br />Way for Phase III Bond Release Area, Colowyo Coal Mine, Permit No. C-1981-019. <br />Dear Mrs. Binns, <br />Enclosed please find two copies of materials provided for your review for Technical <br />Revision 90 (TR-90). TR-90 updates Colowyo permit with a small area exemption and a <br />Tri-State Power Line Right of Way, both are in the Phase III Bond Release area (SL-05). <br />The small area exemption removes Topsoil Pile 15G within reclamation block EP015 and <br />an the access corridor associated with the Pile 15G from the Phase III bond release area as <br />Colowyo needs to access this pile in the future. The other part of this revision provides <br />documentation from Tri-State Generation and Transmission Association, Inc., that they <br />have no objections to Phase III release in the area along their right of way. <br />A copy of the updated pages, an application form, a coy of the public notice, and a change <br />sheet has been included to ease incorporation into the permit. If you have any questions <br />or require additional information, please feel free to contact me at (970) 824-1532. <br />Sincerely, <br /> <br />Tony Tennyson <br />Environmental Engineer <br />Encl. 2 copies <br />Cc: file CF 1.1.1.79 <br />Colowyo Coal Company • 5731 State Highway 13 • Meeker, CO 81641 <br />T+ 1 970 824 1529 • F+ 1 970 824 1598 • http://prospect.riotinto.org/irj/portal
The URL can be used to link to this page
Your browser does not support the video tag.