Laserfiche WebLink
XamhM' r <br /> CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br /> DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Monday, Jan/1712011 Arrive Time: 2:45 PM <br /> Depart Time: <br />Project Name: West Elk Mine RPE Weather: Clear <br />Project Number: M11001MT Temp: <br />Client: Mountain Coal Company Client Representative: <br />General Contractor: Supervisor: Ryan Sweetwood <br />Specialty Contractor: High country Specialty Superintendent or Foreman: Andy Pavlisick <br />Equipment <br />Source of Fill Material: Plans and Specs: <br /> Prepared by: Dated: <br />Contractor's Equipment Used: Dozer, loader, haul truck, excavator, CAT 815 sheepsfoot compactor <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On-Site to: <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow-up from Prior Visit: Retests Performed: <br />Concerns for Next Visit: Retests Needed: <br />Other personnel contacted on-site: name/firm <br />Notes: <br />/ performed nuclear field density tests as requested by Andy Pavlisick of material being placed at the Refuse Pile <br />Expansion. Andy Pavlisick showed the technician the area that was prepared and ready for testing. Lambert and <br />Associates' technician chose the test locations within the area that was ready for testing. Please refer to the these <br />results sheets for approximate test locations and test results. The test results indicate only the relative compaction and <br />soil moisture content of the material tested at the elevation and location tested at the time of our site visit. Moisture <br />content samples were obtained. <br />Lambert and Associates Technician: Hayes