Laserfiche WebLink
Tent arrb jNoo d t,,,, <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Sunday, Jan/1612011 <br />Arrive Time: 11:30 AM <br />Depart Time: <br />Project Name: West Elk Mine RPE Weather: <br />Clear, windy <br />Project Number: M11001MT <br />Temp: <br />Client: Mountain Coal Company Client Representative: <br />General Contractor: Supervisor: Ryan Sweetwood <br />Equipment <br />[Lambert lty Contractor: High country Specialty Superintendent or Foreman: Andy Pavlisick <br />of Fill Material: Plans and Specs: <br />Prepared by: Dated: <br />ctor's Equipment Used: Dozer, loader, haul truck, excavator, CAT 815 compactor <br />and Associates Equipment Used -Manufacturer: <br />CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On-Site to: <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow-up from Prior Visit: <br />Retests Performed: <br />Concerns for Next Visit: <br />Retests Needed: <br />Other personnel contacted on-site: name/firm <br />Notes: <br />l performed nuclear field density tests as requested by Andy Pavlisick of material being placed at the Lower Refuse <br />Pile and at the Refuse Pile Expansion. Andy Pavlisick showed the technician the area that was prepared and ready for <br />testing. Lambert and Associates' technician chose the test locations within the area that was ready for testing. Please <br />refer to the these results sheets for approximate test locations and test results. The test results indicate only the <br />relative compaction and soil moisture content of the material tested at the elevation and location tested at the time of <br />our site visit. Moisture content samples were obtained. <br />bert and Associates Technician: Hayes