Laserfiche WebLink
TJA?m &&Ja$ <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Monday, Jan/0312011 Arrive Time: 12:00 PM <br />Depart Time: <br />Project Name: West Elk Mine RPE Weather: Overcast <br />Project Number: M11004MT Temp: <br />Client: Mountain Coal Company Client Representative: <br />General Contractor: Supervisor: Ryan Sweetwood <br />Specialty Contractor: High country <br />Equipment Specialty Superintendent or Foreman: Andy Pavlisick <br />Source of Fill Material: Plans and Specs: <br />Prepared by: Dated: <br />Contractor's Equipment Used: Dozer, loader, excavators, blade, sheepsfoot compactor <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On-Site to: <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: NO <br />If yes, who was contacted? <br />Follow-up from Prior Visit: Retests Performed: <br />Concerns for Next Visit: Retests Needed- <br />Other personnel contacted on-site: name/firm <br />Notes: <br />1 performed nuclear field density tests as requested by Andy Pavlisick of material being placed at the Lower Refuse <br />Pile and at the Refuse Pile Expansion. Andy Pavlisick showed the technician the area that was prepared and ready for <br />testing. Lambert and Associates' technician chose the test locations within the area that was ready for testing. Please <br />refer to the these results sheets for approximate test locations and test results. The test results indicate only the <br />relative compaction and soil moisture content of the material tested at the elevation and location tested at the time of <br />our site visit. Moisture content samples were obtained. <br />11-ambert and Associates Technician: Hayes