My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-11_REVISION - M1980002 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980002
>
2011-04-11_REVISION - M1980002 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:21:00 PM
Creation date
4/15/2011 9:01:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980002
IBM Index Class Name
REVISION
Doc Date
4/11/2011
Doc Name
SO Application
From
Connell Resources, Inc.
To
DRMS
Type & Sequence
SO2
Email Name
PSH
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V' <br />A4 -198'0 00 7i <br />S O ?,Z STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />L ]DIVISION O F <br />Denver, Colorado 80203 ?? >- tPM RA D O <br />Phone: (303) 866-3567 MATION <br />FAX: (303) 832-8106 NING <br />SAFETY <br />V11- <br />TRANSFER OF MINERAL RECLAMATION PERMIT AND RECO <br />SUCCESSION OF OPERATORS APR ,) t 2011 <br />APPLICATION PACKAGE <br />Division of r: <br />Applicability Mining and Safety <br />This document applies to mining operations where the current permitted mine operator wishes to transfer the Reclamation Permit <br />and permitted reclamation responsibilities to a Successor Operator (a new operator). Please follow the instructions provided in this <br />package for filing an application; Mineral Rules and Regulations and Construction Material Rules and Regulations Number 1.12 <br />(Permit Transfer application requirements) should also be reviewed prior to completing this form. <br />Filing Requirements <br />To apply for a transfer please submit the following to the Division of Reclamation, Mining and Safety (the Division): <br />1) A "Transfer of Permit and Succession of Operator" application form, signed and notarized by an authorized <br />representative of BOTH the current permittee and successor operator; <br />2) The Application Fee of $115.00 for Hard Rock operations and $144.00 for Construction Materials operations; <br />3) A Performance Warranty Form bearing an original notarized signature of an authorized representative of the successor <br />operator; and, <br />4) Financial Warranty: <br />A) You have the option to WAIVE YOUR RIGHT to a thirty (30) day processing time to allow the Division time <br />to recalculate the required financial warranty; or, <br />B) You may choose NOT TO WAIVE YOUR RIGHT to a thirty (30) day processing time. In such case, the <br />Division will recalculate the required financial warranty within sixty (60) days from the decision date (the date <br />the permit is transferred to the Successor Operator). The required RECLAMATION BOND COULD BE <br />SUBSTANTIALLY INCREASED at that time. If the financial warranty is increased, you will then be required <br />to post the additional financial warranty. <br />This application package contains the "Transfer of Permit and Succession of Operator" application form, and a Performance <br />Warranty form for your use. Rule 4.3 of the Mineral Rules and Regulations and Rule 4.3 of the Construction Material Rules and <br />Regulations describes the various acceptable Financial Warranty types. Please contact the Division to obtain the appropriate <br />Financial Warranty form. <br />Upon submittal of this application, the application fee, and the replacement performance and financial warranties the Division will <br />transfer the permit to the Successor Operator. After the transfer is complete the Division will then review the reclamation costs of <br />the permitted operation. The Successor Operator will be notified, if additional reclamation bond is required, within 60 days of <br />approval if you do not wave your right to a decision within 30 days. The Division will notify both operators upon completion of the. <br />permit transfer. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand ]unction • Durango Active and Inactive Mine
The URL can be used to link to this page
Your browser does not support the video tag.