My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-14_PERMIT FILE - X200522306
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200522306
>
2011-04-14_PERMIT FILE - X200522306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:36 PM
Creation date
4/14/2011 1:05:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200522306
IBM Index Class Name
PERMIT FILE
Doc Date
4/14/2011
Doc Name
2005 Exploration Project Final Written Reclamation Report
From
Oxbow Miining, LLC
To
DRMS
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />of cow <br />Fe <br />N <br />* 1876 { <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />COAL EXPLORATION FINAL RECLAMATION REPORT <br />Prospector: Oxbow Mining, LLC. <br />Address: 3737 H 133 <br />PO Box 535, Somerset, Co. 81434 <br />Notice of Intent No.: X-2005-223-05 <br />Project Name: 2005 Exploration Project <br />County: Delta/Gunnison <br />Date: April12, 2011 <br />This report is filed in accordance with Rule 2.02.6(3)(b) of the Regulations of the Colorado Mined <br />Land Reclamation Board for Coal Mining, adopted in accordance with the Colorado Surface Coal <br />Mining Act, C.R.S. 34-33-101 et seq. This report is to be submitted within 30 days after the end <br />of the period of exploration specified in the approved Notice of Intent, as amended. <br />1. Attach a map showing: <br />a) The final locations of all holes drilled during this project; <br />b) the locations of all roads modified or constructed for the project; and <br />c) All areas significantly disturbed by the operator. <br />2. Have all disturbed areas, including drill holes, been reclaimed in accordance with <br />the approved plan and the above-referenced regulations? Yes <br />3. Were any newly constructed project roads retained for the landowner? Yes <br />If yes, a) attach a letter from the landowner that grants consent, b) indicate the road <br />location on a map, and c) describe the approximate specifications of the road <br />(width, length, surface material used). <br />4. Did any drill holes experience surface artesian flow conditions? No <br />If yes, locate these holes on a map and describe sealing and plugging procedures <br />that were used. <br />5. Were any drill holes converted to a water well? No If yes, list the State <br />Engineer's Well Permit Number and name and address of the user.
The URL can be used to link to this page
Your browser does not support the video tag.