My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-14_HYDROLOGY - C1981010
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981010
>
2011-04-14_HYDROLOGY - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:36 PM
Creation date
4/14/2011 1:05:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
HYDROLOGY
Doc Date
4/14/2011
Doc Name
1st Quarter 2011 Sediment Pond Inspections
From
Trapper Mining Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspect
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FILL: 118.7 <br />QUARTERLY SEDIMENT POND INSPECTION REPORT <br />OPERATOR: TRAPPER MINING INC. <br />Y ? <br />INSPECTOR: i S / `?'? SIGNATURE: <br />DRAINAGE: NO NAME <br />?Q RTR_20d < <br />TRAPPER MINE <br />DATE OF INSPECTION/ 01J/ <br /> <br />POND IDENTIFICATION <br />NName #02 77- <br />NName #04 <br />NName #05 <br />Approiamate water level: -4-- 7: /,ve Age -47 <br />Sediment level (% total storage): P;lnl <br />Outflow (cfs): <br />Sediment marker (install or replace) <br />Identification sign (install or replace) i? <br />EROSIONAL: <br />Rills and/or gullies on downstream face. <br />Rills and/or gullies on upstream face. <br />Inadequate vegetation. <br />Outlet channel erosion. <br />Burrows. <br />Erosion of toe. <br />Water impounded against toe. <br />Other. <br />STRUCTURAL: <br />Differential settling. <br />? J <br />t/ <br />Cracks, slides, or scarps. ? C/ <br />Seepage (specify location, color, value). L/ <br />Defective spillways. l./ <br />Other. <br />APPURTENANT STRUCTURES: <br />Defective spillways. <br />U <br />f <br />Dewatering device clogged. <br />Cracking or crushing of pipes. <br />Other. <br />COMMENTS: <br />#05: 60% level = top of post - 4.5'. <br />#04: use riser/siphon tube as sediment marker; siphon top <br />#02: use riser/siphon tube as sediment marker; siphon top <br /> <br />= 75%, bottom = 60%. <br />= 66%, bottom = 50%. <br />MAINTENANCE REQUIRED:
The URL can be used to link to this page
Your browser does not support the video tag.