My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-13_PERMIT FILE - C1980006 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980006
>
2011-01-13_PERMIT FILE - C1980006 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:55 PM
Creation date
4/14/2011 9:15:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Permit File
Doc Date
1/13/2011
Doc Name
pg 780-90 to 780-152
Section_Exhibit Name
Part 780 Reclamation and Operations Plan Part 3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 780.21 (b) Continued. <br />i~ <br />The removal and replacement of overburden material with scrapers <br />will not only increase the permeability of the overburden, but will <br />result in a greater surface area of the overburden material exposed <br />to water. The increased permeability and exposure of water to in- <br />creased surface areas of the material can create a potential for <br />leaching, a possible increase in the TDS concentration, and a <br />change in the ion balance of the water in the spoils. If water <br />from these spoils comes in contact with a ground water aquifer <br />recharge zone, there is the possibility that increased quantities <br />of dissolved solids can enter the ground water aquifer, elevate its <br />TDS concentration and change its ion balance. <br />LJ <br />Impoundment of water on top of spoils can increase the amount of <br />water available for leaching through spoils. This can cause an <br />increase in the TDS concentrations and a change in the ion balance <br />of water within the spoils which could possibly enter a ground <br />water aquifer. A detailed discussion on leaching and the effects <br />of mining on ground water quality is presented in Section <br />780.21(c). <br />Activities and structures at the Kerr Tipple Area do not penetrate <br />the alluvium due to the fact that no mining or excavation occurs at <br />the tipple. As a consequence, the alluvial aquifer at the Kerr <br />Tipple Area will not be dewatered, as demonstrated in Section <br />779.15. <br />I • <br />Methods of Pt6tection'and Mitigation. <br />I Exploration holes used as water monltor wells are cased with plas- <br />tic perforated pipe as described later in this Section. All explo- <br />ration holes not used for monitoring will be sealed to prevent <br />transfer of water between surface and ground water systems. Seal- <br />ing will be accomplished by setting a drill hole plug in the hole <br />and filling the hole with drill cuttings to the surface. The use <br />of drill cuttings as fill material is preferable to other materials <br />780-103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.