Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 1 IA Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Total one-way travel distance: 5.00 miles <br />Average Travel Speed: 45.00 mph <br />Total Non-Roadable Mob/Demob Cost <br />`* two round trips with haul rig: $6,977.52 <br />Total Roadable Mob/Demob Cost ** $12.77 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non-Roadable <br />Equipment Roadable <br />Equipment <br />0.11 0.11 <br />0.11 0.11 <br />0.50 NA <br />0.50 NA <br />1.22 0.22 <br />Total job time: 2.44 Hours <br />Total job cost: $6,990.29 <br />CIRCES Cost Estimating Software