My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-04_INSPECTION - M2000032
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2000032
>
2011-04-04_INSPECTION - M2000032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:32:21 PM
Creation date
4/13/2011 1:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000032
IBM Index Class Name
INSPECTION
Doc Date
4/4/2011
Doc Name
Inspection report
From
DRMS
To
MA Concrete Construction, Inc.
Inspection Date
3/24/2011
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task # 1 IA Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Total one-way travel distance: 5.00 miles <br />Average Travel Speed: 45.00 mph <br />Total Non-Roadable Mob/Demob Cost <br />`* two round trips with haul rig: $6,977.52 <br />Total Roadable Mob/Demob Cost ** $12.77 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non-Roadable <br />Equipment Roadable <br />Equipment <br />0.11 0.11 <br />0.11 0.11 <br />0.50 NA <br />0.50 NA <br />1.22 0.22 <br />Total job time: 2.44 Hours <br />Total job cost: $6,990.29 <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.