Laserfiche WebLink
Pagel of 2 <br />SCRAPER TEAM WORK <br />Task description: Haul onsite fill to pit, place and compact <br />Site: Monument View Gravel Pit Permit Action: SI-01 Permit/Job#: M2000032 <br />PROJECT IDENTIFICATION <br />Task #: 05A State: Colorado <br />Date: 3/31/2011 County: Mesa <br />User: THM <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT <br />COSTShift basis: 1 per day <br />iption <br />-Scraper: LCat 637G w/push-pull <br />-Dozer: Cat D8R Series II - 8SU (2005) <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: CAT 120H <br />-Water Truck: NA <br />Cost Breakdown: Scraper Wnrk Team gnnnnrt Fmmnmant X/1.;......... <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 50 NA NA 50 NA <br />Ownership cost/hour: $91.74 $39.08 NA NA $15.04 NA <br />Operating cost/hour: $202.41 $43.55 NA NA $15.18 NA <br />Ripper op. cost/hour: NA $0.00 NA NA $0.00 NA <br />Operator cost/hour: $38.67 $38.49 NA NA $38.49 NA <br />Unit Subtotals: $332.82 $121.12 NA NA $68.71 NA <br />Number of Units: 2 1 0 0 1 0 <br />Group Subtotals: Work: $786.76 Support: $0.00 Maint: $68.71 <br />Total work team cost/hour: $855.47 <br />MATERIAL OUANTITIES <br />Initial volume: 93,600 CCY Swell factor: 1.000 <br />Loose volume: 93,600 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,400 lbs/LCY <br />Material description: Clay and gravel - Dry <br />Rated Payload: 75,000 pounds <br />Payload Capacity: 31.25 LCY <br /> <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />Adjusted Capacity: 29.00 LCY <br />Abbreviation: None <br />Filename: M032-05a <br />CIRCES Cost Estimating Software