Laserfiche WebLink
Loader Worksheet Cont'd Task # 002 Page 2 of 2 <br />Load Bucket Cavacit <br />Total Travel Time: <br />Total Cycle Time: <br />0.1804 minutes <br />0.6704 minutes <br />Rated Capacity: 4.20 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - uniform aggregates to 1/8" (95-100%) 0.975 <br />Adjusted Capacity: 4.10 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6380 feet <br />Source <br />Altitude Adj: 1.00 CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) <br />Unit cost: $0.299 /LCY <br />366.49 LCY/Hour <br />304.19 LCY/Hour <br />304.19 LCY/Hour <br />Total job time: 92.46 Hours <br />Total job cost: $8,417.00 <br />CIRCES Cost Estimating Software