Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Initial Bond <br />Site: Frentress Gravel Pit Permit Action: Initial Bond <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 3/31/2011 County: Routt <br />User: DMC <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br /> <br />Task <br /> <br />Description Form <br /> <br />Used Fleet <br /> <br />Size Task <br /> <br />Hours <br /> <br />Cost <br />002 Transport backfill from stockpile to highwall LOADER 1 92.45 $8,417.00 <br />003 Grade it slopes to 3H: IV DOZER 1 10.34 $1,640.09 <br />004 Transport topsoil from stockpile to disturbed areas <br />(6 ac. a LOADER 1 18.57 $1,691.00 <br />005 Placement of topsoil (6 ac. at 7" depth) DOZER 1 4.04 $641.31 <br />006 Vegetate disturbed area REVEGE 1 40.00 $7,111.58 <br />007 Mob./Demob. reclamation crew/equipment MOBILIZE 1 5.20 $3,419.72 <br />SUBTOTALS: 170.6 $22,920.70 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Performance bond: 1.05 <br />Job superintendent: 0.00 <br />Profit: 10.00 <br />Permit/Job#: M2011017 <br />Abbreviation: None <br />Filename: M017-001 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and/or administration: 5.00 $1,295.82 <br />CONTINGENCY: 3.00 Total = $687.62 <br />TOTAL INDIRECT COST = $5,479.18 <br />TOTAL BOND AMOUNT (direct + indirect) = $28,399.88 <br />Rounded to $28,500.00 <br />$463.00 <br />$240.67 <br />$0.00 <br />$2,292.07 <br />$2,995.74 <br />$25,916.44 <br />Total = 500.00 <br />Total = $0.00